COSCO Zhoushan shipyard refines three Maersk ships
After successfully repairing and refitting Maersk\'s four K-series ships, COSCO Zhoushan once again obtained the repair order of Maersk\'s four S-Series ships. \"Suofen\" is the third ship of Maersk s series. Its main repair works include hatch cover, binding bridge, partial ballast tank, deck water rust removal and painting, steel structure engineering, overhaul and maintenance of engine room equipment and valves. The quotation period of the four ships is 20 days. The repair works of the first three ships are completed in advance, and the repair period is controlled at about 18 days. The \"Suofen\" entered the factory for repair and sailed smoothly on December 9.
Similarly, Maersk\'s \"Luna\" was put into the factory for repair. This ship is the first ship of two L-Series refitted ships. The project is a modification project and routine repair, which requires a total of 3 docking times to complete. At present, the repair and refitting of the project is progressing in an orderly manner. The watertight adjustment of the hatch cover is carried out, the assembly and welding of the new bulbous bow and the blue oil test of the new blades are carried out. In terms of safety, quality and production progress, Zhoushan COSCO Shipping Co., Ltd. was highly appraised by the stationed maintenance.